From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Christopher A. Gable 1009 Gregory Road 270-963-2241 Objective Submitting
this resume to give a short overview of my qualifications so that I may be
considered for assignment as a Construction Manager. Summary I
have over 21 year’s management experience in the telecommunications industry.
I have a strong background in site builds including foundations, structural
steel, towers, underground utilities, airport construction,
telecommunications, and state highways. Skills
and Abilities Manage
multiple construction projects while reporting in a corporate structure site
construction progress and keeping time lines per projected goals. Microsoft
Office, Word, Excel, Power Point, Outlook, Site Tierra Sprint/Nextel,
Publisher, Access 2000,AutoCAD Acrobat 8.0 various HTML programs. Knowledge
of ISO 2000 LTE UMTS Wimaxx TDMA CDMA Iden Edge Fiber optics technologies
Implementation experience of Ericson, Nortel, Motorola, Cisco Wimaxx,
Alvarion Huweai and many other wireless base stations. Coaxial Sweep test
knowledge for various carriers including Sprint Nextel Cingular ATT. PIM test
certified Anritsu sweep test proficient and Yellow fin drive test equipment.
Backhaul microwave pathing and Ceragon Ceraview software proficient as wells
as telnet software. Background in all phases of site builds including foundations,
excavation, sanitary and storm sewer, water and gas lines, towers, structural
steel, buildings and electrical construction. General knowledge of building
and electrical codes. Experienced in zoning and building permitting
processes. Public relations skills and experience. Work
History 2013-Present SAC
Wireless Construction Manager Oversee
project build for ATT NSB and ETTCS OHPA in markets. Familiar with AT&T,
502 quality standards, drivers and all aspects of the turf build. Ensure
sites continue on time line per project plan. Preform safety audits on all in
market teams. Communicate work progress internally to responsible team
members for reporting to the client. Pre-construction plan and material
reviews. Responsible for review of all closeout documentation. 2007-
2013 Telamon Corp. Wireless Project Manager Supplement wireless workforce department with
multiple clients. Drive projects from site acquisition to completion. Worked
in conjunction with sales teams to successfully deploy 40 sites for new start
up WiMAX Company and create networks while working with RF engineers and site
acquisition to implement optimal site builds for coverage areas. Develop
actual building standards create review and finalize construction drawings
while working with PE’s. Complete site document packages quality control
drive test optimization. Manage AT&T LTE and UMTS builds (40 sites), and
Verizon corrective action work. Quality audits for in shelter fiber optic
installations and manage new installations for quality control corrections. 2007
T-Mobile Field engineer Minneapolis MN. Responsible for managing crews on 200 plus UMTS
upgrades. Also report progress, QA sites, developed strategies for completing
difficult work in short maintenance windows. Document control and site
optimization in coordination with RF Bridge. 2003-2007
Nokia-Siemens construction field inspector /project manager TN/KY Oversee accomplished construction projects ( 150
sites) from initial site candidate evaluations to bringing sites on air, Plan
evaluations and mark up, Consultation with engineers for corrections and
proper carrier specifications, Utilities coordination with local entities,
Cost analysis of bids from contractors, Logistics coordination with clients,
vendors and contractors, Quality control, Provide assistance with real estate
personnel on preferred and cost effective building sites, Assist in
application process of local zoning and planning offices industry.
2002-2003
Wireless Facilities Inc. Construction Manager Memphis, Tn. ATT 3G
project Successful
implementation of new electric panels on some 200 plus existing ATT sites,
Logistics coordination with vendor’s clients and contractors, Site timeline
reporting, Consult with engineers on drawings, Provide solutions for problems
sites, Sketch and layout of sites for proper codes compliance, Evaluate bids
and assign contractors Weekly reporting of implementation progress. Providing
input on site design for contractor scope of work. Supervising construction crews
as well as setting schedules. 2000-2002
ATT Wireless Construction Coordinator Louisville Ky. Managed 350 new site builds from site design to
final punch. Responsible for contractor evaluation, quality control and
construction cost analysis using a bid matrix. Created materials list from
site plans and coordinated contractor pick up of materials. Applied for all
state building codes enforcement permits for shelters. Responsible for all
local zoning and permitting issues. Input, review and redline of drawings in
coordination with design engineering professionals. Provided contractor
guidance with issues on sites. Reported schedules progress and time lines on
a weekly basis. Coordinated with technical operations personnel to
efficiently hand off sites for integration. Generated schedules with multiple
contractors to efficiently hand off each phase of the construction process.
Scheduled bid walks with contractors and evaluated bids to ensure all issues
were covered in the bid price.
1999-2000
O2 Wireless Project Manager Fredericksburg, Md. managed several construction crews on multiple
site builds. Supervised construction process to ensure correct site design
compliance. Evaluated sites for bid. Responsible for materials take off of
construction plans and sourced all materials. Sourced sub-contractors to
supplement workforce. Education 1990-1992,
1995 Western Kentucky University Course of study: Education with emphasis on
Mathematics and History 1988-1990
Campbellsville University Course of study: Pre-engineering |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|